LicensorABB, Axens
ClientTÜPRAS ( Turkish Petroleum Refineries Co.)
ContractorAlarko Contracting Group (Alsim) – LG Engineering & Construction Corp, Korea
Project Completion Date1 st of July 2008

Description of the Project

The project consists of engineering, procurement, manufacturing equipment and implementation of all civil, mechanical, electrical and instrumentation works on a turn-key basis.
The aim of the project is to increase the production capacity of unleaded fuel and bring the ceiling limit of sulphur content of diesel oil down to 0.005% for conformance with the EC norms to be adopted in the year 2005. The project shall be completed in 2008 June.
The main works include :
7.900 tons process equipment, 2.400 tons piping, 64.000 m2 painting, 76.000 m2 insulation, 60.000 m3 excavation, 33.600 m3 concrete, 2.800 tons steel works.