Licensor | ABB, Axens |
Client | TÜPRAS ( Turkish Petroleum Refineries Co.) |
Contractor | Alarko Contracting Group (Alsim) – LG Engineering & Construction Corp, Korea |
Project Completion Date | 1 st of July 2008 |
Description of the Project
The project consists of engineering, procurement, manufacturing equipment and implementation of all civil, mechanical, electrical and instrumentation works on a turn-key basis.
The aim of the project is to increase the production capacity of unleaded fuel and bring the ceiling limit of sulphur content of diesel oil down to 0.005% for conformance with the EC norms to be adopted in the year 2005. The project shall be completed in 2008 June.
The main works include :
7.900 tons process equipment, 2.400 tons piping, 64.000 m2 painting, 76.000 m2 insulation, 60.000 m3 excavation, 33.600 m3 concrete, 2.800 tons steel works.