ClientTUPRAS (Turkish Petroleum Refineries Co.)
Design and FabricationLummus H.S.T., the Netherlands – Alarko Contracting Group (Alsim)
ContractorAlarko Contracting Group (Alsim)

Description of the Project
The Project consisted of the engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the air pre-heater system to save energy equivalent to 25.000 tons/year of fuel oil. The start-up and commissioning were also performed by Alarko Contracting Group.