Client | TEK (Turkish Electricity Institude) |
Design | Hcg, Nem, the Netherlands (boilers) – Ganz, Hungary (turbines) |
Capacity | 2×30 MW |
Contractor | Alarko Contracting Group (Alsim) |
Description of the Project
The turn-key Project consisted of the engineering,procurement and execution of all civil, mechanical, electrical and instrumentation works of the combined cycle power plant with a capacity of 2×30 MW. The performance tests,commissioning and start-up were also performed by Alarko Contracting Group.