ClientTKI (General Directorate of Turkish Coal Works)
DesignAlarko Contracting Group (Alsim)
Capacity2×800 tons/hour
ContractorAlarko Contracting Group (Alsim)

Description of the Project
The Project consisted of design, engineering, procurement, manufacturing of equipment and the execution of all mechanical and electrical works of a coal crushing and conveying system within Yatagan Thermal Power Plant on turn-key basis.