ClientThe Greater City Municipality of Istanbul
Project Duration44 months
Capacity70,000 passangers per hour per direction
ContractorAlarko Contracting Group (Alsim) – Garanti Koza

Description of the Project

The project consists of the engineering, procurement and construction of 4,725 m long metro system extension between 4. Levent and Dogakoy with 3 stations including the depot area.
The main works items of the project are as follows:
– Construction of Sanayi, ITU Ayazaga and Ataturk Oto Sanayi stations,
– Conventional deep bored tunnel construction 14,425 m,
– 77,000 m² depot area.