ClientTUPRAS (Turkish Petroleum Refineries Co.)
LicensorStein Industrie, France
Capacity2×80 tons/hour steam
ContractorAlarko Contracting Group (Alsim)

Description of the Project
The Project consisted of engineering, procurement, manufacturing of equipment and the execution of all civil, mechanical, electrical and instrumentation works of 2 power boilers, each with a capacity of 80 tons/hour steam at a pressure of 43 bars. Auxilary systems such as deaerator, condensation tank, pressure reducing station, fuel heating and pumping system and water demineralization system with a capacity of 200 m³/hour were also included in the scope of the project.