ClientTUPRAS (Turkish Petroleum Refineries Co.)
Capacity4×120 tons/hour steam
2×120 MW turbines
ContractorAlarko Contracting Group (Alsim)

Description of the Project
The turn-key Project consisted of the engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the following units:

4 boilers with a capacity of 120 tons/hour steam each, at a pressure of 100 bars and a temperature of 540°C , 2 turbo generators with a capacity of 12 MW each, water treatment unit with a capacity of 300 m³/hour.