Client | KUMAS (Kutahya Magnesite Inc.) |
Design | Alarko Contracting Group (Alsim) |
Capacity | 80.000 tons/year |
Contractor | Alarko Contracting Group (Alsim) |
Description of the Project
The Project consisted of engineering, procurement, manufacturing of equipment and the execution of all civil, mechanical and electrical works of the sinter magnesite plant on turn-key basis.