Client | BOTAS Petroleum Pipeline Co. |
Engineering and Procurement | Alarko Contracting Group (Alsim) – Bonatti S.p.A, Italy |
Description of the Project
Steel Pipe | 41.000 m | dia | 100-300 mm |
Polyethylene Pipe | 489.000 m | dia | 20-125 mm |
Galvanized Pipe | 1.605.000 m | 1.605 mm |